Our Most Relevant Projects.

We deliver comprehensive solutions for process and comfort applications.

Nuestros proyectos
VOLVO

VOLVO

Nuevo León 2025-2026 Chiller plant system – 1,500 tons of cooling capacity PPR chilled water distribution piping system

View details
FORD El Cristo

FORD El Cristo

State of Mexico, México. 2021-2023. CPB – EGL BUILDING Chiller system – 1,500 tons cooling capacity Chilled water air handling units – 272,900 CFM PPR chilled water distribution piping system.

View details
General Motors Ramos Arizpe

General Motors Ramos Arizpe

Installation of 10 TMI units — 2,400 tons cooling capacity Supply and installation of 60 exhaust fans — 1,260,000 CFM Direct expansion system — 262 tons cooling capacity Dedicated ventilation systems for JCI equipment. PLANTA GPS – BODYSHOP GPS Plant — Body Shop Installation of 56 TMI units — 2,970,000 CFM Supply and installation of 132 exhaust fans — 3,330,000 CFM Direct expansion system — 795 tons cooling capacity

View details
Goodyear

Goodyear

MANUFACTURING PLANT Ventilation and air renewal system — 2,916,560 CFM

View details
Ford Hermosillo

Ford Hermosillo

Suministro e instalación de 3 chillers centrífugos de 1000 toneladas cada uno, 3 torres de enfriamiento de 3,000 GPM cada una, Chilled water and condenser water pumping systems Control systems Ten 60-ton chilled water air handling units Heavy lifting and assembly of four 500-ton TMI air handling units

View details
Foxconn

Foxconn

Technology manufacturing plant Chilled water and liquid cooling system for critical processes 25,000 TR chilled water process system Over 15,000 linear meters of steel piping

View details
Amazon Data Center

Amazon Data Center

Chiller water plant with variable flow pumping system Dedicated air handling units (DAHU) — total capacity 850,000 CFM Greenheck energy recovery systems in Data Hall 170 m³ Thermal Energy Storage system High-efficiency Mitsubishi VRF system and Daikin energy recovery ventilation system in main office building

View details
Citi Banamex

Citi Banamex

Supply and installation of 1,050 tons air-cooled chiller system Cooling towers — 3,150 GPM Secondary pumping system — 2,520 GPM

View details
Grand Kino

Grand Kino

Water Source Heat Pump system Cooling towers — total 1,080 GPM Heat exchanger system VFD pumping system — 1,120 GPM Integrated BMS and fire protection system

View details
Colossus

Colossus

Water Source Heat Pump system Cooling towers — total 1,080 GPM Heat exchanger system VFD pumping system — 1,120 GPM Integrated BMS and fire protection system

View details
Celtara Medical and Professional Center

Celtara Medical and Professional Center

Water Source Heat Pump system Cooling towers — 1,026 GPM Heat exchanger system Variable flow pumping system Integrated BMS and fire protection system

View details
Hospital Ángeles Puebla

Hospital Ángeles Puebla

HOSPITALIZACIÓN MEDICAL TOWER – HOSPITALIZATION Direct expansion system — 600 tons Chiller system — 700 tons Fresh air renewal system

View details
Hospital Ángeles Tijuana

Hospital Ángeles Tijuana

MEDICAL TOWER – HOSPITALIZATION Direct expansion system — 270 tons Chiller system — 700 tons Fresh air renewal system

View details
Kimberly Clark (Área Sequoia)

Kimberly Clark (Área Sequoia)

Supply and installation of 830 tons in split systems, rooftop units, and direct expansion ventilation units for clean room applications

View details
Pepsico

Pepsico

Replacement of six 300-ton INTELLIPACK units Replacement of galvanized sheet metal duct systems with textile duct solutions

View details
Cervecería Modelo Hidalgo

Cervecería Modelo Hidalgo

Supply and installation of 160 tons VRF system 50 tons direct expansion system Supply and installation of 132 HP refrigeration systems for cold storage rooms

View details
Cervecería Modelo Cd. Obregón

Cervecería Modelo Cd. Obregón

Corporate Headquarters Office HVAC upgrade using 140-ton Mitsubishi VRF system 26-ton Daikin energy recovery ventilation system

View details
Latecoere

Latecoere

Construction and conditioning of ISO 9 controlled environment room comprised by three 20-ton packaged units with inline boosters to achieve positive pressure

View details
Omni pontoque

Omni pontoque

VRF System Installation

View details
Playa Blanca Luxury Condos

Playa Blanca Luxury Condos

670 tons direct expansion system

View details
Hotel y villas VIDAFEL

Hotel y villas VIDAFEL

Building 3 — Direct expansion system 480 tons cooling capacity

View details
Hotel Lucerna

Hotel Lucerna

400-ton chiller system

View details